Step 3 & 4: System Qualifications & Final Forms

Step 3: System Qualifications

Please have your contractor fill out the System Qualifications Form (PDF).

*To be completed after project has passed city or county inspections.

Step 4: Final Forms

  • Renewable Energy Incentive Program—Step 4 Submittal Of Final Rebate Application Forms

  • After the Solar or Wind Generation system has been installed and passed all City and/or County building inspections, the Mohave Electric Cooperative member submits the following paperwork to finalize the rebate application procedure:

    • A copy of the final bill or invoice from the Solar/Wind Contractor
    • Copy of the Building Permit
    • Copy of the final Building Inspection
    • The System Qualifications-Contractor Certification form with code requirements initialed by a licensed electrician (step 3)
    • W-9 Tax Form (PDF)

    At this point, all three steps are complete and now the system must pass system verification by Mohave Electric Cooperative’s Energy Management Specialist and Operations Supervisor for compliance with MEC Interconnection Agreement.

    It is also important to remind you that you cannot activate or operate your system before it has passed the MEC verification.

    After the system verifications are passed, the rebate will be processed and issued to the Member.

    You may submit your forms below or mail back to us.


  • Please submit:

    1. A copy of the final bill or invoice from the Solar/Wind Contractor
    2. Copy of the Building Permit
    3. Copy of the final Building Inspection
    4. The System Qualifications-Contractor Certification form with code requirements initialed by a licensed electrician (step 3)
    5. W-9 Tax Form (PDF)
    Drop files here or
    Max. file size: 100 MB.