AMI METER INSTALLATION UPDATE

AMI METER INSTALLATION

 

Mohave Electric Cooperative crews are installing new Advanced Metering Infrastructure (AMI) meters in Bullhead City and Fort Mohave.  Meter technicians will be working in the following areas for approximately four weeks:

·         West of Highway 95 from Sterling Road, south to Aztec Road.

·         South from Aztec Road to Boundary Cone Road on both sides of Highway 95.

·         Scattered installations throughout Bullhead City

            The meter technicians will be in vehicles marked with the Mohave Electric Cooperative logo and will have photo ID. They will knock on your door to let you know that they are there to install your new meter, but you do not need to be present for the meter change.

            The meter technician will not need access to your home or business other than to the electric meter location. Anyone asking to come into your home, or without Mohave Electric authorized credentials should be reported to law enforcement.

Together We Save